Joint spacing in feet contraction joints may be tooled into the concrete surface at the time of placement.
Expansion joints concrete slabs spacing.
Joints are commonly spaced at distances equal to 24 to 30 times the slab thickness.
Joint spacing that is greater than 15 feet require the use of load transfer devices dowels or diamond plates.
They should also be placed around structures that go deeper than the concrete slab such as columns or walls.
It is also influenced by the slab dimensions type of concrete and the reinforcing materials being used.
Transverse joint spacing should not exceed 125 to 150 of the longitudinal joint spacing.
A 4 thick slab should have joints 1 deep.
Usually expansion joints should be no farther apart than 2 to 3 times in feet the total width of the concrete in inches.
So for a 4 inch thick concrete slab expansion joints should be no more than 8 to 12 feet apart.
For a 100mm slab.
Keyed joints are not recommended for industrial floors.
Longitudinal joint spacing on two lane and multilane concrete pavements typically is about 10 to 13 ft 3 0 to 4 2 m.
Tips for placing concrete expansion joints place joints around 30 times the slab thickness apart.
Maximum joint spacing should be 24 to 36 times the thickness of the slab.
Saw cutting cuts joints as soon as the concrete is hard enough that the edges abutting the cut don t chip from the saw blade.
Joint spacing in meters.
It is also important to keep slabs as square as possible.
Joints should be spaced about 10 feet and a maximum of 15 feet.
The expansion joint gap depends on the type of slab like floating slab floor vehicle pavement sidewalk or monolithic slab foundation.
Space joints in feet no more than 2 3 times the slab thickness in inches.
If you have a 4 inch slab and multiply it by 24 to 32 you will find that your joints should be placed every 96 to 144 inches or 8 to 12 feet if you have a 5 inch slab and multiply it by 24 to 32 you will find that your joints should be placed every 120 to 180 inches or 10 to 15 feet.
Make sure joints are cut deep enough.
Cracks in concrete may occur at the expansion joints due to improper concrete mix or curing.
How to cut joints groover tools cut joints in fresh concrete.
A 4 slab should have joints 8 12 feet apart.
When using joint groove for contraction joints the joint should be a minimum depth of thickness of the slab.
Cut joints deep enough cut joints 25 of the depth of the slab.
So for a slab which is 100mm thick the joints should be placed.
Saw cut joints should be done within 4 to 12 hours after the concrete has been finished.